『佳木斯升降柱』路桩安装注意事项

日期:2019-10-10 15:03


『佳木斯升降柱』路桩安装注意事项

『佳木斯升降柱』路桩安装注意事项

1、在安装防撞升降柱沟渠的底部需要做渗水层,铺平后再放防撞柱,防撞柱定位好后,然后回填商品混凝土

At the bottom of the ditch with anti-collision elevating column, the seepage layer should be made. After paving, the anti-collision column should be placed. After the anti-collision column is positioned, the commercial concrete should be backfilled.

2、首先需要确定安装升降柱的开挖路面位置,确保下方无线缆及天燃气管道。

Firstly, it is necessary to determine the location of the excavated road surface with lifting column to ensure the wireless cable and gas pipeline below.

『佳木斯升降柱』路桩安装注意事项
 

3、地基挖坑:在车辆出入道路口,挖出一条路面长度*宽度1米的沟渠

Foundation Digging: Digging a ditch with a road length * width of 1 metre at the entrance and exit of vehicles
 

4、回填混凝土时需注意一下两方面:

Two aspects should be paid attention to when backfilling concrete:

(1) 回填混凝土时注意一定不要放入预埋地盒中,如有必要需用泡沫纸把地盒包住后再进行混凝土的倾倒。

When placing Backfill Concrete, be sure not to put it in the pre buried box. If necessary, use foam paper to wrap the box and then pour the concrete.

(2) 在周边缝隙倒沙子和石子(混凝土)前,一定要先把升降柱升起放直,这样使柱体倾斜偏幅角度较小。 

 Before pouring sand and stone (concrete) into the surrounding cracks, the lifting column must be lifted and straightened so as to make the inclination angle of the column smaller.

5、布线管:在防撞柱回填混凝土之前需要把线管预留好,每台需要是独立的线管连接到升降柱的控制箱,线管粗度为2530的管

Wiring Pipe: Before backfilling concrete in the anti-collision column, the pipeline should be reserved. Each of the pipelines should be connected to the control box of the lifting column independently. The pipeline thickness is 25 or 30.

『佳木斯升降柱』路桩安装注意事项
 